5. What is the main challenge associated with transporting wind turbine blades?**
Heavy weight
Oops!
Okay!
7. What type of trailer is used for transporting wind turbine components?**
Lowbed Trailer
Oops!
Okay!
1 What means should be used to transport the propeller from the port to the construction site?
Super Heavy Trailer
Oops!
Okay!
6. Which port is chosen for the transportation of wind turbines for the Ninh Thuan project?**
Cam Ranh port
Oops!
Okay!
4. Which company manufactures the wind turbines used in the Ninh Thuan Wind Power Project?**
Enercon
Oops!
Okay!
2 How many tons of CO2 emissions does the construction of wind power projects like Ninh Thuan help reduce on average per year?
430000 tons
Oops!
Okay!
8. What is the total capacity of the Ninh Thuan Wind Power Project by Trung Nam Group?**
46.2 MW
Oops!
Okay!
3 Which part of the wind turbine is the largest and most difficult to transport?
Propeller
Oops!
Okay!