Toggle Navigation
Games
Blog
Class PIN
Join for Free
Sign in
Toggle Navigation
Games
PIN
Join for Free
Blog
Pricing
Contact us
Help center
Sign in
Study
grammar
0
%
0
0
0
Back
Restart
The final report __________ (submit) at the end of the month
will be submitted
Oops!
Okay!
The drill bit __________ (replace) after the damage was discovered.
was replaced
Oops!
Okay!
The drilling site __________ (inspect) by safety officers every morning.
is inspected
Oops!
Okay!
Safety protocols __________ (follow) during each shift.
are followed
Oops!
Okay!
The well __________ (drill) last month.
was drilled
Oops!
Okay!
The drilling report __________ (submit) after the final inspection
will be submitted
Oops!
Okay!
The rig __________ (move) to a new location tomorrow.
will be moved
Oops!
Okay!
The rig __________ (maintain) once a week.
is maintained
Oops!
Okay!
The rig __________ (shut down) after the leak was detected.
was shut down
Oops!
Okay!
The equipment __________ (transport) to the site yesterday.
was transported
Oops!
Okay!
The mud system __________ (upgrade) next month.
will be updated
Oops!
Okay!
The well __________ (abandon) after reaching total depth.
was abandoned
Oops!
Okay!
The formation data __________ (collect) before the storm hit.
was collected
Oops!
Okay!
Samples __________ (analyze) in the lab daily.
are analyzed
Oops!
Okay!
Formation samples __________ (send) to the lab by Friday.
will be sent
Oops!
Okay!
Drill cuttings __________ (remove) from the wellbore every few hours.
are removed
Oops!
Okay!
The new well __________ (drill) next week.
will be drilled
Oops!
Okay!
Blowout preventers __________ (test) twice a week.
are tested
Oops!
Okay!
Pressure readings __________ (record) at regular intervals.
are recorded
Oops!
Okay!
Safety procedures __________ (review) before the operation begins.
will be reviewed
Oops!
Okay!
The casing __________ (install) last Monday.
was installed
Oops!
Okay!
Your experience on this site will be improved by allowing cookies.
Allow cookies