Study

Sentence Correction (Site Investigation Report)

  •   0%
  •  0     0     0

  • We can built a harbour.
    We can build a harbour.
  • The project required a detailed investigate of soil strength.
    The project required a detailed investigation of soil strength.
  • The river is beside the village on the left.
    The river is to the west of the village.
  • The project site is located in the northern of Waingapu.
    The project site is located in the north of Waingapu/in the northern Waingapu.
  • The team must followed right steps.
    The team must follow the right steps.
  • Before the construction start.
    Before the construction starts.
  • The geotechnical site investigation focused on subsurface conditions, e.i., soil composition, bearing capacity, and groundwater level
    The geotechnical site investigation focused on subsurface conditions, i.e., soil composition, bearing capacity, and groundwater level.
  • Some surveys were conducted to check the soil condition, measure land and seabed contours, and wave characteristics of the area.
    Some surveys were conducted to check the soil condition, land and seabed contours, and wave characteristics of the area.
  • The coastal is often flooded.
    The coast/the coastal area is often flooded.
  • The soil and water resistivity measurements was carried out in Kanatang, East Sumba, East Nusa Tenggara.
    The soil and water resistivity measurements were carried out in Kanatang, East Sumba, East Nusa Tenggara.
  • Geology study
    Geological study
  • The measurement data that has processed into an earth model.
    The measurement data was processed/has been processed into an earth model.
  • We get many benefits such as direct access to the port or the sea can become calm, etc.
    We get many benefits such as direct access to the port and calmer seas.
  • A hydrography survey was conducted to measure surface water bodies, including oceans, seas, lakes, and rivers.
    A hydrographic survey was conducted to measure surface water bodies, including oceans, seas, lakes, and rivers.
  • We need extend the trestle.
    We need to extend the trestle.
  • The project has potential to develop with a lower budget and a shorter duration.
    The project has potential to be developed with a lower budget and a shorter duration.
  • The warehouse is located in the northward.
    The warehouse is located in the north.
  • The objective of the project is to meet regional demand of sea transportation for the next 25 years.
    The objective of the project is to meet regional demand for sea transportation for the next 25 years.
  • Sea can became calm.
    The sea can become calm.
  • ince regional and sectoral developments continue to increase, the demand for electricity energy is a lot.
    Since regional and sectoral developments continue to expand, the demand for electricity is significant.
  • The excavation site is situated at the bottom edge of Katanang.
    The excavation site is on the south side of Katanang.
  • We need to collect some data like oceanography, topography, and doing soil investigation.
    We need to collect some data like oceanography, topography, and soil investigation.
  • Some area need extra work.
    Some areas need extra work.
  • The hard of rocks was measured using special tools.
    The hardness of rocks was measured using special tools.