Edit Game
Revision CT
 Delete

Use commas to add multiple tags

 Private  Unlisted  Public



 Save

Delimiter between question and answer:

Tips:

  • No column headers.
  • Each line maps to a question.
  • If the delimiter is used in a question, the question should be surrounded by double quotes: "My, question","My, answer"
  • The first answer in the multiple choice question must be the correct answer.






 Save   18  Close
What is the full form of NTPC?
National Thermal Power Cooperation.
The _____ system of railways will assure larger capacity, higher speedand consequently cheaper transportation.
Unigauge
What is the full form of BRO?
Borde Roads Organisation
The district road are constructed and maintained by ______.
Zila Parishad
A major road development project linking Delhi-Mumbai-Chennai-Kolkata-delhi is called ______.
Golden Quadrilateral Highway project.
The twenty year road plan was drafted in ______.(year)
1961
The first serious attempt to develop road network in India was made in 1943, through the _____.
Nagpur Plan
The animal or plant material which can be converted into energy is called ______.
Biomass
The places, under the earth's surface where hot magma is not very deep is called _____.
Hotspot
Alternate rise and fall of water are called ______.
Tides.
______ are used to harness wind power
Windmills
The _____ are used in solar cookers which can cook rice, pulses etc.
solar collector
The ______ fields, south of Mumbai High yields more petroleum that Mumbai High.
Bassein
The _______ dam is one of the longest dams in India.
Hirakud
Coal is a _______ energy resource.
Non renewable
The first coal mine in India was opened in 1774 at _______.
Raniganj
_______ is soft, but more compact than peat.
Lignite.
__________ is the hardest and best quality of coal with more than 80% of carbon.
Anthracite