Game Preview

Scrum Master

  •  English    35     Public
    Preparing for PSMI Exam
  •   Study   Slideshow
  • What are the attributes of every Product Backlog item?
    Description, Order, Value, Estimate
  •  15
  • If the Development Team has too little work to do at the end of the sprint, what could they do?
    Work with the Product Owner to select new items from off the Product Backlog
  •  15
  • Three Scrum teams are working together to build a single product.  How many Product Backlogs should they be using?
    All teams should use a single Product Backlog.
  •  15
  • A Development Team has taken on too much work in a sprint.  What is the best way to handle this situation?
    Renegotiate the work to achieve the Sprint Goal in a different way.
  •  15
  • In Scrum, smaller time-boxes are fit inside of a container time-box.  What is that container time-box called?
    A sprint
  •  15
  • When does Product Backlog Refinement occur?
    With whatever frequency that the Scrum Team wants and needs
  •  15
  • Who can instruct a Development Team to work on a different set of requirements other than the Product Backlog?
    no one can do this
  •  15
  • In Scrum, how many people can be on the Development Team?
    Between 3 and 9
  •  15
  • What is Scrum.org's training approach for its trainers and training materials?
    Scrum.org centralizes training and training materials.
  •  15
  • What is the passing score for the Professional Scrum Master (PSM) level One exam?
    85%
  •  15
  • Where should bug defects be tracked?
    On the Product Backlog, if they can't be fixed within the current sprint
  •  15
  • How does Scrum say value should be expressed on Product Backlog items?
    Scrum doesn't say how value should be expressed
  •  15
  • Who are the mandatory attendees of the Daily Scrum?
    The Development Team
  •  15
  • In the November 2017 edition of the official Scrum Guide, what are Scrum time-boxes called?
    Events
  •  15
  • For the first sprint, a Scrum Team needs two key inputs.  The first key input is a Product Backlog.  What is the second key input?
    A Development Team's work capacity
  •  15
  • What does a Product Owner optimize?
    The value of the Development Team's work
  •  15