Game Preview

MSSC Introduction to Control Charts

  •  English    17     Public
    Control Charts
  •   Study   Slideshow
  • Control charts are used to determine the process _____.
    capability
  •  15
  • Control charts provide _____ data to allow manufacturers to analyze problems on a piece of equipment.
    historical
  •  15
  • A control chart allow _______ to fix problems before bad parts are produced.
    operators
  •  15
  • Plot data over time with a control chart s the best way to predict the _____of a process?
    future performance
  •  15
  • Statistical process control has two types of data. Which one is mostly used with go/no go gauges?
    Attribute
  •  15
  • Variable and attribute data are used to define what type of chart?
    Control chart
  •  15
  • When making a yes-or-no decision, what type of sampling should be used?
    Attribute sampling
  •  15
  • Which control chart tracks two aspects of data?
    X-bar and R chart
  •  15
  • Processes that run in control are considered _______manufacturing processes
    capable
  •  15
  • The X-bar chart relies on averaging measurements of parts. What is the other calculation plotted on the R chart?
    range
  •  15
  • The _____ chart plots the average value of each subgroup
    X-bar
  •  15
  • The data for an X-bar and R chart places time intervals on the X-axis and what other data from the sample on the Y-axis?
    Measurement units
  •  15
  • ________employees in the plant benefit when defect trend data is collected and problems are corrected
    All
  •  15
  • In an unstable process, the mean of the measurements is outside the control limits of the process. The process should be
    investigated
  •  15
  • What often happens if operators make adjustments to recently produced parts based on recent measurements? Part variations _____
    increase
  •  15
  • When only one point is outside the X-bar or R chart control limits, what special cause may have occurred?
    power surge
  •  15