12 stages of construction video, at what stage is the reference point established to ensure that the drawings are laid out on the ground? 1) Clearing of the ground 2) Site layout 3) Excavation 3) Setting perimeter blocking
Site layout
15
Choose the word to complete the word pair: acoustic- !) equipment 2) Insulation
insulation
15
Choose the word to complete the word pair: concrete- 1) aggregate 2) mix
mix
15
Choose the word to complete the word pair: electrical- 1) gates 2) fitting
fittings
15
Choose the word to complete the word pair: alarm- 1) systems 2) fencing
systems
15
Choose the word to complete the word pair: steel- 1) mix 2) staircase
staircase
15
What are the 3 types os insulation? From our text
thermo, acoustic, fire protection
25
Complete these conversations. A: I need some three-core cable, please. 2.5mm. 240V B: I’m sorry. We’re 1) in stock 2) out of stock
out of stock
15
Complete the conversation. A: I want to order some timber. B: Yes, of course. What’s your 1) customer number 2) order number
customer number
15
Choose the duty that each worker is responsible for: building inspector 1) co-ordinate specifications 2) check buildings
check buildings
15
Choose the duty that each worker is responsible for: Architect 1)co-ordinate specifications 2) design and install drainage systems
co-ordinate specifications
15
Construction site managers spends most his time at the site. Why? (name 3)
1) they receive the updates daily 2) they implement any changes 3) they also communicate with top members of the project.
25
Bad weather can cause long delays on construction sites. Give 3 examples.
1) Hot weather-causes workers to become dehydrated 2) Wet weather- makes mud a problem 3) Strong winds- blow things away 4) Lightning can kill worker/visitors
25
Site engineer must be responsible for safety of the site? true or false
true
15
The level checks must be done by the site engineer? true or false