Game Preview

⚙️🧠 From Engineering to Business Metaphor ...

  •  English    27     Public
    A speaking game for C1–C2 Business English learners working in engineering and technical environments.
  •   Study   Slideshow
  • 🔩 “I feel like a cog in the machine at work.” Agree or disagree? Words to use: however · contribution · visible
    Model answer: I partly agree; however, even if you feel small, your contribution should still be visible in a good organisation.
  •  15
  • 🚀 Opinion: Innovation in pharma hinges more on people than technology. Words to use: although · hinge on · expertise
    Model answer: Although technology is vital, progress really hinges on human expertise and decision-making.
  •  15
  • ⚙️ Scenario – Design delay.  A design problem forces you to short-circuit the usual approval steps. Words to use: instead of short-circuit · consequences
    Model answer: Instead of short-circuiting the process, I’d assess the consequences and get fast approval from key people.
  •  20
  • 🧩 Roleplay –  Design Engineer / Logistics Manager. Task: A component redesign affects packaging and transport. Words to use: impact · coordinate · timeline
    Model answer: We need to coordinate quickly because this change will impact packaging and the delivery timeline.
  •  25
  • 📘 Quote: “A good leader is a safety valve for team stress.” Do you agree? Words to use: because · safety valve · release
    Model answer: Yes, because leaders should act as a safety valve and help release pressure before it builds up.
  •  15
  • 🏗️ Opinion: Strong teams are built on load-bearing people. Words to use: metaphor · rely on · pressure
    Model answer: It’s a good metaphor because some team members carry more pressure and others rely on them.
  •  15
  • 🔄 Scenario – Scope creep.  Your project keeps expanding. It’s becoming hard to control. Words to use: gradually · crank up · resources
    Model answer: The scope has gradually cranked up, so we need more resources and tighter control.
  •  15
  • 🧠 Idiom: When have you latched on to a good idea at work? Words to use: immediately · potential · develop
    Model answer: I latched on immediately because I saw the potential and wanted to help develop it.
  •  15
  • 🎯 Opinion: Every project needs a clear blueprint before starting. Words to use: otherwise · blueprint · direction
    Model answer: Otherwise, without a blueprint, the team lacks direction and wastes time.
  •  15
  • ⚡ Idiom: What situations at work make people blow a fuse? Words to use: typically · overload · deadlines
    ⚡ Idiom: What situations at work make people blow a fuse? Words to use: typically · overload · deadlines
  •  15
  • 🌍 Roleplay – Pharma client / Design engineer. Task: Client wants changes late in the project. Words to use: impact · timeline · feasibility
    Model answer: We need to review the impact on the timeline and check the feasibility before confirming.
  •  25
  • 🧠 Quote: “Great ideas often percolate slowly.” Agree or disagree? Words to use: over time · percolate · refine
    Model answer: I agree because ideas often percolate over time as we refine them.
  •  15
  • 🧩 Idiom: Describe a riveting presentation in 30 seconds. Words to use: engaging · clear · attention
    Model answer: A riveting presentation is engaging, clear and keeps everyone’s attention.
  •  10
  • 🏭 Scenario – Production bottleneck.  One department slows down the whole process. Words to use: bottleneck · identify · resolve
    Model answer: We need to identify the bottleneck quickly and resolve it to keep production moving.
  •  20
  • ⚙️ Scenario – Sudden regulation change. New compliance rules affect your design. Words to use: adapt · quickly · ensure
    Model answer: We must adapt quickly and ensure the design meets all new regulations.
  •  25
  • 🧠 Final Opinion: A company without innovation is like a machine without a propeller. Words to use: metaphor · drive · forward
    Model answer: It’s a strong metaphor because innovation is what drives a company forward.
  •  15