  • Some area need extra work.
    Some areas need extra work.
  •  15
  • The team must followed right steps.
    The team must follow the right steps.
  •  15
  • Sea can became calm.
    The sea can become calm.
  •  15
  • We can built a harbour.
    We can build a harbour.
  •  15
  • Before the construction start.
    Before the construction starts.
  •  15
  • We need to collect some data like oceanography, topography, and doing soil investigation.
    We need to collect some data like oceanography, topography, and soil investigation.
  •  25
  • We get many benefits such as direct access to the port or the sea can become calm, etc.
    We get many benefits such as direct access to the port and calmer seas.
  •  25
  • Some surveys were conducted to check the soil condition, measure land and seabed contours, and wave characteristics of the area.
    Some surveys were conducted to check the soil condition, land and seabed contours, and wave characteristics of the area.
  •  25
  • The geotechnical site investigation focused on subsurface conditions, e.i., soil composition, bearing capacity, and groundwater level
    The geotechnical site investigation focused on subsurface conditions, i.e., soil composition, bearing capacity, and groundwater level.
  •  15
  • We need extend the trestle.
    We need to extend the trestle.
  •  15
  • The objective of the project is to meet regional demand of sea transportation for the next 25 years.
    The objective of the project is to meet regional demand for sea transportation for the next 25 years.
  •  20
  • ince regional and sectoral developments continue to increase, the demand for electricity energy is a lot.
    Since regional and sectoral developments continue to expand, the demand for electricity is significant.
  •  25
  • The project has potential to develop with a lower budget and a shorter duration.
    The project has potential to be developed with a lower budget and a shorter duration.
  •  20
  • The measurement data that has processed into an earth model.
    The measurement data was processed/has been processed into an earth model.
  •  20
  • The soil and water resistivity measurements was carried out in Kanatang, East Sumba, East Nusa Tenggara.
    The soil and water resistivity measurements were carried out in Kanatang, East Sumba, East Nusa Tenggara.
  •  15
  • A hydrography survey was conducted to measure surface water bodies, including oceans, seas, lakes, and rivers.
    A hydrographic survey was conducted to measure surface water bodies, including oceans, seas, lakes, and rivers.
  •  15