Game Preview

Everybody Up 6 Unit 7 Lesson 4

  •  English    20     Public
    Unit 7 Lesson 4
  •   Study   Slideshow
  • How long did it take to build the Golden Gate Bridge?
    Four years. 1933 to 1937
  •  15
  • How many veicles cross the Golden Gate Bridge a day?
    About 100,000.
  •  15
  • What two countries are connected by the Channel Tunnel?
    The United Kingdom and France.
  •  15
  • How long is the Channel Tunnel?
    It is 50.5 kilometers long.
  •  15
  • Thanks to ............ technology, bridges and tunnels can now go over and under large ...... .. ..... .
    modern / bodies of water
  •  15
  • The Channel Tunnel is the longest .......... tunnel in the world.
    underwater
  •  15
  • The Golden Gate Bridge is the .... ...... ...... in the world.
    most famous bridge
  •  15
  • When was the Golden Gate Bridge started to be built?
    1933
  •  15
  • When was the Golden Gate Bridge finished being built?
    1937
  •  15
  • How high is the Golden Gate Bridge?
    It's 227 meters high.
  •  15
  • How wide is the Golden Gate Bridge?
    It's 27 meters wide.
  •  15
  • When did they start contructing or building the Channel Tunnel?
    In 1988.
  •  15
  • When was the Channel Tunnel completed?
    In 1994.
  •  15
  • How high and wide is the Channel Tunnel?
    It 's 7.6 meters high and 7.6 meters wide.
  •  15
  • How many people travel through the Channel Tunnel every day?
    About 20,000 people. / About twenty thousand people.
  •  15
  • Where is the Golden Gate Bridge?
    In California.
  •  15